alert icon
Website Alert
Lorem ipsum dolor sit amet, consectetur adipiscing elit. In accumsan urna urna, in pulvinar arcu lobortis ut.
View covid guidelines
Office of Health Care Access
 
Final CON Decisions 2009
 
 

Applicant:

Stonington Behavioral Health, Inc. d/b/a Stonington Institute

Docket No.:

09-31391-CON

Project Title:

Termination of Acute Hospital Services for Adolescent Female Patients.

Date:

December 31, 2009

Summary:

Stonington Institute’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Eastern Connecticut Health Network, Inc.

Docket No.:

09-31379-CON

Project Title:

Acquisition of a Positron Emission Tomography/Computed Tomography Scanner and Operation of the Scanner at Manchester Memorial Hospital.

Date:

December 31, 2009

Summary:

Eastern Connecticut Health Network, Inc.’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

The University of Connecticut

Docket No.:

09-31371-CON

Project Title:

Establishment and Operation of an Outpatient Rehabilitation Clinic in Mansfield (Storrs), Connecticut.

Date:

December 28, 2009

Summary:

The University of Connecticut’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

North Haven Pain Medicine Center, LLC

Docket No.:

09-31320-CON

Project Title:

Addition of Ear, Nose and Throat Surgical Procedures.

Date:

December 21, 2009

Summary:

North Haven Pain Medicine Center, LLC’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

PTSMA, Inc. d/b/a Select Physical Therapy

Docket No.:

09-31307-CON two Decisions were made
Decision - December 16, 2009
Decision - August 25, 2009

Project Title:

Proposal to Establish an Outpatient Rehabilitation Center in Ellington, CT.

Date:

December 16, 2009 and August 25, 2009

Summary:

December 16. 2009 -

PTSMA, Inc. d/b/a Select Physical Therapy’s request for CON has been approved and a Certificate of Need has been GRANTED.

August 25, 2009 -

PTSMA, Inc. d/b/a Select Physical Therapy’s request for CON has been denied and a Certificate of Need has not been granted.

 

Applicant:

New Britain MRI LLP d/b/a MRI of New Britain

Docket No.:

09-31163-MDF

Project Title:

Request to modify a Certificate of Need previously issued under Docket Number: 08-31163-WVR to extend the expiration date.

Date:

December 16, 2009

Summary:

New Britain MRI LLP d/b/a MRI of New Britain’s request for modification has been APPROVED.

 

Applicant:

Family Resource Associates, LLC.

Docket No.:

09-31136-MDF

Project Title:

Request to modify a Certificate of Need previously issued under Docket Number 08-31136-CON to extend the expiration date.

Date:

December 16, 2009

Summary:

Family Resource Associates, LLC’s request for modification has been APPROVED.

 

Applicant:

FaithCare, Inc.

Docket No.:

09-30870-MD2

Project Title:

A request to modify Docket Number 06-30870-CON as modified by Docket Number 09-30870MDF requesting further extension of the CON expiration date in order to fully implement the authorized project form August 8, 2009 to April 6, 2010.

Date:

December 3, 2009

Summary:

FaithCare, Inc.’s request for modification has been approved.

 

Applicant:

Saint Vincent’s Medical Center

Docket No.:

09-31327-CON

Project Title:

Acquisition of Positron Emission Tomography/Computed Tomography Scanner

Date:

November 25, 2009

Summary:

Saint Vincent’s Medical Center’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Johnson Memorial Hospital

Docket No.:

09-31491-WVR

Project Title:

Waive CON Requirements for the Replacement of an Existing Single-Slice CT Scanner with a 16-Slice CT Scanner at the Johnson Surgery Center.

Date:

November 20, 2009

Summary:

Johnson Memorial Hospital’s request for Waiver has been APPROVED.

 

Applicant:

MC1 Healthcare, LLC d/b/a Mountainside Treatment Center

Docket No.:

09-31282-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order under Docket Numer: 08-31282-CON to allow a change in the Name of the Licensee of the facility from Artemis Partners, LLC to MC1 Healthcare, LLC., a related legal entity.

Date:

November 20, 2009

Summary:

MCI Healthcare, LLC d/b/a Mountainside Treatment Center has been APPROVED.

 

Applicant:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care

Docket No.:

09-31257-MDF

Project Title:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care’s request for a modification of a CON under Docket No. 08-31257-WVR, Replacement of an Existing Linear Accelerator.

Date:

November 20, 2009

Summary:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care’s request for modification has been APPROVED.

 

Applicant:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care

Docket No.:

09-31114-MDF

Project Title:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care’s request A modification of a CON under Docket No. 08-31114-CON Acquisition and Operation of a Second Linear Accelerator.

Date:

November 20, 2009

Summary:

Northeast Regional Radiation Oncology Network, Inc. d/b/a Community Cancer Care has been APPROVED.

 

Applicant:

Saint Mary’s Hospital, Inc.

Docket No.:

09-31295-MDF

Project Title:

Saint Mary’s Hospital, Inc.’s request for a modification of a Certificate of Need issued by OHCA under Docket Number 08-31295-WVR pursuant to 19a-639c, C.G.S., Replacement of a CT Scanner by Saint Mary’s Hospital.

Date:

November 19, 2009

Summary:

Saint Mary’s Hospital, Inc.’s request for modification has been APPROVED.

 

Applicant:

Danbury Hospital

Docket No.:

09-31472-WVR

Project Title:

Waive CON Requirements for the Replacement of the Hospital’s Existing 4-Slice CT Scanner with a 32-Slice CT Scanner.

Date:

October 22, 2009

Summary:

Danbury Hospital’s request for Waiver has been APPROVED.

 

Applicant:

Connecticut Department of Children and Families

Docket No.:

09-31422-CON

Project Title:

Termination of Residential Treatment Services at High Meadows in Hamden.

Date:

November 19, 2009

Summary:

Connecticut Department of Children and Families’ request for termination of residential treatment services at High Meadows in Hamden has been approved by AGREED SETTLEMENT.

 

Applicant:

Valley Imaging Partners, LLC

Docket No.:

09-31395-CON

Project Title:

Termination of CT Scanning Services at the Applicant’s Office Located in Naugatuck.

Date:

November 05, 2009

Summary:

Valley Imaging Partners, LLC’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Jefferson Radiology, P.C. and Medical Imaging Center, P.C.

Docket No.:

09-31322-CON

Project Title:

Acquisition of a Magnetic Resonance Imaging Scanner and a Computed Tomography Scanner in Bloomfield as part of a Physician Practice Merger.

Date:

November 05, 2009

Summary:

Jefferson Radiology, P.C. and Medical Imaging Center, P.C.’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Housatonic Valley Radiological Associates, P.C

Docket No.:

09-31463-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing Single-Slice CT Scanner with a 16 –Slice CT Scanner in Southbury.

Date:

October 28, 2009

Summary:

Housatonic Valley Radiological Associates, P.C’s request for waiver has been Approved.

 

Applicant:

Diagnostic Imaging of Southbury, LLC

Docket No.:

09-31460-WVR

Project Title:

Request to Waiver CON Requirements for the Replacement of an Existing 1.5 Tesla Strength MRI Scanner with a 1.5 Tesla-Strength MRI Scanner in Southbury

Date:

October 28, 2009

Summary:

Diagnostic Imaging of Southbury, LLC’s request for waiver has been Approved.

 

Applicant:

Housatonic Valley Radiological Associates, P.C

Docket No.:

09-31462-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing Mobile-Based, 1.0 Tesla-Strength MRI Scanner with a Fixed-Based, 1.5 Tesla-Strength MRI Scanner in Southbury.

Date:

October 28, 2009

Summary:

Housatonic Valley Radiological Associates, P.C’s request for waiver has been Approved.

 

Applicant:

Greenwich Radiological Group, PC and Greenwich Radiology Partners, LLC

Docket No.:

09-31458-WVR

Project Title:

Request to Waive CON Requirements for the Repalcement of an Existing 2-Slice CT Scanner with a 20-Sclie CT Scanner in Greenwich

Date:

October 28, 2009

Summary:

Greenwich Radiological Group, PC and Greenwich Radiology Partners, LLC’s request for waiver has been Approved.

 

Applicant:

Windsor Dispensary Clinic, Inc.

Docket No.:

07-30999-CON

Project Title:

A request to Establish and Operate Methadone Maintenance and Ambulatory Detoxification Programs for Substance Abuse in Windsor.

Date:

October 27, 2009

Summary:

Windsor Dispensary Clinic, Inc.’s request to establish and operate methadone maintenance and ambulatory detoxification programs has not been approved and a Certificate of Need has been DENIED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31289-CON

Project Title:

Establish Three Imaging Operating Rooms:  One Room with and Intraoperative Magnetic Resonance Imaging Scanner; a Second Room with Biplane Angiography Equipment; and a Third Room with Single-plane Robotic Angiography Equipment.

Date:

October 19, 2009

Summary:

Yale-New Haven Hospital’s request to establish three imaging operating rooms has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Robert D. Russo M.D. & Associates Radiology P.C.

Docket No.:

09-31485-CON

Project Title:

Proposal to combine the GE LightSpeed CT unit and the GE Advance PET unit into the integrated Discovery LS PET/CT.

Date:

October 21, 2009

Summary:

Robert D. Russo M.D. & Associates Radiology P.C.'s proposal to combine the GE LightSpeed CT unit and the GE PET unit as an integrated PET/CT unit is hereby approved.

 

Applicant:

Community Mental Health Affiliates

Docket No.:

09-31360-CON

Project Title:

Termination of Services at Northwest Center for Family Services in Winsted.

Date:

October 16, 2009

Summary:

Community Mental Health Affiliates’ request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Housatonic Valley Radiological Associates, PC.

Docket No.:

09-31444-WVR

Project Title:

Request to Waive CON Requirements for a Replacement of and MRI Scanner in Ridgefield.

Date:

September 22, 2009

Summary:

Housatonic Valley Radiological Associates, PC request for waiver has been Approved.

 

Applicant:

Inter-Community Mental Health Group, Inc.

Docket No.:

09-31343-CON

Project Title:

Request for Termination of Psychiatric Outpatient Clinic for Adults in Wethersfield.

Date:

September 23, 2009

Summary:

Inter-Community Mental Health Group, Inc.’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-30410-MDF

Project Title:

Request to modify a previously authorized CON under Docket Number 08-30410-MD2.

Date:

September 21, 2009

Summary:

Yale-New Haven Hospital’s request for modification has been GRANTED.

 

Applicant:

Mandell & Blau, MDs, PC

Docket No.:

09-31455-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Open MRI in Glastonbury.

Date:

September 17, 2009

Summary:

Mandell & Blau, MDs, PC request for waiver has been Approved.

 

Applicant:

Mandell & Blau, MDs, PC

Docket No.:

09-31453-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Open MRI in Middletown

Date:

September 17, 2009

Summary:

Mandell & Blau, MDs, PC request for waiver has been Approved.

 

Applicant:

Housatonic Valley Radiological Associates, P.C.

Docket No.:

09-31446-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 16-Slice CT Scanner with a New 20 Slice CT Scanner in Danbury.

Date:

September 17, 2009

Summary:

The Housatonic Valley Radiological Associates, P.C.’s  request for waiver has been Approved.

 

Applicant:

Middlesex Hospital

Docket No.:

09-31262-MDF

Project Title:

A request to modify the CON authorized under Docket Number 08-31262-CON requesting that OHCA vacate Condition #3 from the Agreed Settlement in order to allow the Hospital to continue to operate the existing Linear Accelerator after the new unit is operational.

Date:

September 15, 2009

Summary:

Middlesex Hospital’s request for a modification of a previous authorized Certificate of Need under Docket Number 08-31662 has not been Approved.

 

Applicant:

HealthCenter Imaging of Fairfield County, LLC d/b/a HealthCenter Imaging

Docket No.:

09-25546-MDF

Project Title:

A Request to modify Docket Number 02-545 under which OHCA authorized a Certificate of Need for the establishment of a dedicated cardiac PET-CT imaging center in Trumbull, Connecticut.

Date:

September 15, 2009

Summary:

HealthCenter Imaging of Fairfield County, LLC d/b/a HealthCenter Imaging’s request for a modification of a previous authorized Certificate of Need under Docket Number 02-545 has not been Approved.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31352-CON

Project Title:

Acquisition of Leased Gamma Knife in New Haven

Date:

September 10, 2009

Summary:

Yale-New Haven Hospital’s request for the acquisition of leased gamma knife in New Haven has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Norwalk Hospital

Docket No.:

08-31256-CON

Project Title:

Proposal to Establish a Fixed-Based PET/CT Service from a Mobile-Based PET/CT Service that will be Located at the Norwalk Radiology and Mammography Center in Norwalk, CT.

Date:

September 3, 2009

Summary:

Norwalk Hospital’s request to establish a Fixed-Based PET/CT Services has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

David C. Goyette, Current Owner, d/b/a Vernon Walk-In Medical Care Center

Docket No.:

09-31301-CON

Project Title:

Change of Ownership of Vernon Walk-In Medical Care Center.

Date:

August 27, 2009

Summary:

David C. Goyette, Current Owner, d/b/a Vernon Walk-In Medical Care Center's request for change in ownership has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31420-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 4-Slice CT Scanner for a New 16-Slice CT Scanner in New Haven.

Date:

August 24, 2009

Summary:

Yale-New Haven Hospital’s request for waiver of CON requirements has been Approved.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31421-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 16-Slice PET/CT Scanner for a New 16-Slice PET/CT Scanner in New Haven.

Date:

August 25, 2009

Summary:

Yale-New Haven Hospital’s request for waiver of CON requirements has been Approved.

 

Applicant:

S.B.D.I. Holding LLC, d/b/a Diagnostic Imaging of Milford

Docket No.:

09-31431-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 0.23 Tesla-Strength Open MRI Scanner with a New 0.70 Tesla-Strength Open MRI Scanner in Milford.

Date:

August 25, 2009

Summary:

S.B.D.I. Holding LLC, d/b/a Diagnostic Imaging of Milford’s request for waiver of CON requirements has been Approved.

 

Applicant:

Advanced Radiology Consultants, LLC

Docket No.:

09-31434-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 0.3 Tesla Strength MRI Scanner with a New 1.5 Tesla-Strength MRI Scanner in Orange.

Date:

August 25, 2009

Summary:

Advanced Radiology Consultants, LLC’s request for waiver of CON requirements has been Approved.

 

Applicant:

Southern Connecticut Imaging Centers, LLC

Docket No.:

09-31429-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 0.7 Tesla Strength Open MRI Scanner with a New 1l5 Tesla-Strength MRI Scanner in Hamden.

Date:

August 25, 2009

Summary:

Southern Connecticut Imaging Centers, LLC’s request for waiver of CON requirements has been Approved.

 

Applicant:

Radiology Associates of Hartford, PC

Docket No.:

09-31437-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 1.0 Tesla-Strenght Closed MRI Scanner with a New 1.5 Tesla-Strength Closed MRI Scanner in Enfield.

Date:

August 24, 2009

Summary:

Radiology Associates of Hartford, PC request for waiver of CON requirements has been Approved.

 

Applicant:

Greenwich Hospital

Docket No.:

08-31280-CON

Project Title:

Acquisition and Operation of a 32-Slice CT Scanner for Use in the Emergency Department.

Date:

August 10, 2009

Summary:

Greenwich Hospital’s request to acquire a 32-slice computed tomography scanner has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31082-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date from July 15, 2009 to July 15, 2010

Date:

August 6, 2009

Summary:

Yale-New Haven Hospital’s request to modify a previous Certificate of Need authorized under 08-31082 has been approved and a modification has been GRANTED.

 

Applicant:

The Hospital of Central Connecticut

Docket No.:

09-31424-WVR

Project Title:

Request to Waive CON requirements for the Replacement of an Existing 0.7 Tesla-Strength Open MRI Scanner with a New 1.2 Tesla-Strength Open MRI Scanner in Southington.

Date:

August 6, 2009

Summary:

The Hospital of Central Connecticut’s request for waiver has been Approved.

 

Applicant:

Saint Francis Hospital and Medical Center

Docket No.:

09-31400-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing Single-Slice CT Simulator with a New 16-Slice CT Simulator in Hartford.

Date:

July 28, 2009

Summary:

Saint Francis Hospital and Medical Center’s request for waiver has been APPROVED.

 

Applicant:

HealthSouth Corporation

Docket No.:

08-31088-CON

Project Title:

Termination of Outpatient Rehabilitations Services and Closure of the HealthSouth Sports Medicine and Rehabilitation Clinic in Norwalk

Date:

July 28, 2009

Summary:

HealthSouth Corporation’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

New Milford Hospital and New York Presbyterian Healthcare System, Inc.

Docket No.:

09-31365-CON

Project Title:

Termination of Diagnostic Cardiac Catheterization Service at New Milford Hospital

Date:

July 23, 2009

Summary:

New Milford Hospital and New York Presbyterian Healthcare System, Inc.’s request has been approved and a Certificate of Need has been GRANTED

 

Applicant:

Stuart Calle, M.D., d/b/a A Medical Walk-In Center

Docket No.:

08-31243-CON

Project Title:

Proposal to Establish a Licensed Urgent Care Walk-In Center in Newington

Date:

July 23, 2009

Summary:

Stuart Calle, M.D., d/b/a A Medical Walk-In Center’s request has been approved and a Certificate of Need has been GRANTED

 

Applicant:

Greenwich Hospital

Docket No.:

08-31283-CON

Project Title:

Establishment and Operation of Outpatient Physical Therapy and Occupational Medicine Services in Stamford

Date:

July 21, 2009

Summary:

Greenwich Hospital’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

The Charlotte Hungerford Hospital

Docket No.:

09-31297-CON

Project Title:

Termination of Mobile Positron Emission Tomography Service in Winsted

Date:

July 23, 2009

Summary:

The Charlotte Hungerford Hospital’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Connecticut Orthopaedic Specialists, P.C.

Docket No.:

09-31394-WVR

Project Title:

Request to Waive CON Requirements for the replacement of an Existing 1.0 Tesla Strength Extremity MRI Scanner with a 1l5 Tesla-Strength Full Body MRI Scanner in Hamden

Date:

July 21, 2009

Summary:

Connecticut Orthopaedic Specialists, PC’s request meets the requirements for waiver of the CON process and has been APPROVED.

 

Applicant:

Greenwich Hospital and Greenwich Endoscopy Center, LLC

Docket No.:

09-30864-MDF

Project Title:

Greenwich Hospital and Greenwich Endoscopy Center, LLC’s  request for a modification of the Certificate of Need authorization issued under Docket Number 06-30864-CON, as was previously modified for a time extension under Docket Number 08-30864-MDF and 08-30864-MD2 The termination of services by Greenwich Hospital at The Endoscopy Center of Greenwich Hospital and for the establishment and operation of

a freestanding gastroenterology center by Greenwich Endoscopy Center, LLC.

Date:

July 17, 2009

Summary:

Greenwich Hospital and Greenwich Endoscopy Center, LLC’s request for modification of a previous CON authorized under Docket Number 06-30864-CON has not been approved and modification has been DENIED.

 

Applicant:

The Stamford Hospital

Docket No.:

09-30828-MDF

Project Title:

A request to modify Docket Number 06-30828-CON in order to increase the authorized capital expenditure

Date:

July 16, 2009

Summary:

The Stamford Hospital’s request for modification of a previous CON authorized under Docket Number 06-30828-CON has been approved and modification has been GRANTED.

 

Applicant:

Capitol Upright MRI, LLC

Docket No.:

08-31255-CON

Project Title:

Acquisition and Operation of a Fonar Upright Magnetic Resonance Imaging (MRI) Scanner in Farmington, CT.

Date:

July 9, 2009

Summary:

Capitol Upright MRI, LLC’s request for the Acquisition and Operation of a Fonar Upright MRI Scanner has not been approved and a Certificate of Need has been DENIED.

 

Applicant:

Forme’ Rehabilitation of Connecticut, Inc.

Docket No.:

08-31239-CON

Project Title:

Establishment of Multi-Specialty Rehabilitation Outpatient Clinic in Norwalk

Date:

June 29, 2009

Summary:

Forme’ Rehabilitation of Connecticut, Inc.’s request to establish a multi-specialty rehabilitation outpatient clinic in Norwalk has not been approved and a Certificate of Need has been DENIED.

 

Applicant:

Jeffrey T. Koslowski, D.D.S. d/b/a Koslowski Orthodontics, P.C.

Docket No.:

08-31278-CON

Project Title:

Acquisition of 3D Dental CT Imaging Unit

Date:

June 25, 2009

Summary:

Jeffrey T. Koslowski, D.D.S. d/b/a Koslowski Orthodontics, P.C.’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Bridgeport Hospital

Docket No.:

08-31279-CON

Project Title:

Purchase of an Existing Radiation Therapy Practice and Acquisition of a Replacement Linear Accelerator to Establish a Hospital Satellite Radiation Therapy Facility in Trumbull.

Date:

June 25, 2009

Summary:

Bridgeport Hospital’s request has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Bridgeport Hospital

Docket No.:

09-31384-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 8- slice CT Scanner with a 16 Slice CT Scanner in Bridgeport.

Date:

June 26, 2009

Summary:

Bridgeport Hospital’s request for Waiver of CON Requirements has been approved and a CON has been GRANTED.

 

Applicant:

The Stamford Hospital

Docket No.:

09-30374-MDF

Project Title:

Establish an Elective Angioplasty and Open Heart Surgery Program at Stamford Hospital

Date:

June 11, 2009

Summary:

The Stamford Hospital’s request for modification of a previous CON authorized under Docket Number 04-30374-CON, as previously modified by Docket Number 07-30374-MDF has been approved and a modification has been GRANTED.

 

Applicant:

Greenwich Hospital and Greenwich Ambulatory Surgery Center, LLC

Docket No.:

09-30813-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to increase the authorized capital cost, by $1,503,990 from $8,552,992 to $10,056,982

Date:

June 11, 2009

Summary:

Greenwich Hospital and Greenwich Ambulatory Surgery Center, LLC’s request for modification of a previous CON authorized under Docket Number 06-30813-CON has been approved and a modification has been GRANTED.

 

Applicant:

Meriden Imaging Center, Inc. d/b/a Radiology Associates, Inc.

Docket No.:

08-31292-CON

Project Title:

Acquisition of a 16-Slice CT Scanner in Wallingford.

Date:

June 9, 2009

Summary:

Meriden Imaging Center, Inc., d/b/a Radiology Associates, Inc.’s request to acquire a 16-slice computed tomography (“CT”) scanner to replace an existing 4-slice CT scanner in Wallingford has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Greenwich Hospital

Docket No.:

09-31057-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date by one year  to December 1, 2010.

Date:

June 4, 2009

Summary:

Greenwich Hospital’s request for a modification of a previous CON authorized under Docket Number: 07-31057 has been approved and Modification has been GRANTED.

 

Applicant:

Connecticut Oncology & Hematology, LLP

Docket No.:

09-30510-MDF

Project Title:

A modification of a previous Certificate of Need authorization in order to allow the Applicant to enter into a contractual arrangement with The Charlotte Hungerford Hospital for CHH to utilize COH’s existing position emission tomography scanner one day a week until December 31, 2009.

Date:

June 5, 2009

Summary:

Connecticut Oncology & Hematology, LLP’s request for a modification of a previous CON authorized under Docket Number 05-30510-CON has been approved and modification has been GRANTED.

 

Applicant:

Lawrence and Memorial Hospital

Docket No.:

09-30742-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date and to increase the authorized capital expenditure.

Date:

May 28, 2009

Summary:

Lawrence and Memorial Hospital’s request to modify a previous Certificate of Need authorized under 06-30742-CON has been approved and Modifications to conditions #1, #2 and #3 have been GRANTED.

 

Applicant:

Middlesex Hospital

Docket No.:

08-31262-CON

Project Title:

Acquisition of a Second Linear Accelerator with Image-Guided Radiation Therapy at Middlesex Hospital

Date:

May 12, 2009

Summary:

Middlesex Hospital’s request has been modified, denying their request for an additional linear accelerator and approving a replacement of the existing linear accelerator by an AGREED SETTLEMENT.

 

Applicant:

Saint Vincent’s Medical Center

Docket No.:

08-31227-CON

Project Title:

Establish and Operate New Hospital Satellite in Stratford for Primary Care Services to be known as “St. Vincent’s Family Practice”

Date:

May 18, 2009

Summary:

Saint Vincent’s Medical Center’s request to provide primary care services in Stratford has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Mountainside Foundation, Inc. d/b/a Mountainside Lodge and Artemis Partners, LLC d/b/a Artemis Partners

Docket No.:

08-31282-CON

Project Title:

Change in Ownership of Mountainside Foundation, Inc., Owner and Operator of Mountainside Lodge, an Inpatient Substance Abuse Treatment Facility, to Artemis Partners, LLC.

Date:

May 18, 2009

Summary:

Mountainside Foundation, Inc. d/b/a Mountainside Lodge and Artemis Partners, LLC d/b/a Artemis Partners request for change in ownership has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Saint Mary’s Hospital

Docket No.:

08-31294-CON

Project Title:

Proposal to Acquires a Philips Brilliance 16-Slice CT Scanner to Replace an Existing Single-slice Philips PQ-2000.

Date:

May 18, 2009

Summary:

Saint Mary’s Hospital’s request to acquire a Philips Brilliance CT Scanner to Replace an Existing Scanner has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Jewish Family Services of Greater Hartford

Docket No.:

08-31245-CON

Project Title:

Terminate Psychiatric Services at the Behavioral Health Outpatient Clinic in Avon

Date:

May 18, 2009

Summary:

The Jewish Family Services of Greater Hartford Request to Terminate Psychiatric Services in Avon has been Approved and a Certificate of Need has been GRANTED.

 

Applicant:

The Hospital of Central Connecticut

Docket No.:

09-31368-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 4-Slice CT Scanner with a 32-Slice CT Scanner in New Britain

Date:

May 11, 2009

Summary:

The Hospital of Central Connecticut meets the requirements for wavier of the CON process for the Replacement of an Existing Scanner and Certificate of Need has been GRANTED.

 

Applicant:

Greenwich Hospital

Docket No.:

09-30874-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to revise the Order wording and allow the back up linear accelerator to be used on a regular basis for a limited selection of radiation therapy patients.

Date:

May 5, 2009

Summary:

Greenwich Hospital’s modification request of a previous Certificate of Need authorized under Docket Number 06-30874-CON, as previously modified by Docket Number 08-30874-MDF has been approved and modification has been GRANTED.
 

Applicant:

FaithCare, Inc. (formerly Christian Medical Fellowship)

Docket No.:

09-30870-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date to August 8, 2009.

Date:

April 2, 2009

Summary:

FaithCare, Inc. (formerly Christian Medical Fellowship) modification request of a previous Certificate of Need authorized under Docket Number 06-30870-CON has been approved and modification has been GRANTED.
 

Applicant:

Griffin Hospital

Docket No.:

09-31023-MDF

Project Title:

A request to modify a previous Certificate of Need authorization in order to increase the authorized capital cost, by $640,952 from $4,319,023 to $4,959,975

Date:

April 27, 2009

Summary:

Griffin Hospital’s modification request of a previous Certificate of Need authorized under Docket Number 07-31023-CON has been approved and modification has been GRANTED.
 

Applicant:

Saint Raphael Healthcare System, Hamden Surgery Center, LLC

Docket No.:

08-31254-CON

Project Title:

Terminate Ambulatory Surgical Services at the Hamden Surgery Center

Date:

May 1, 2009

Summary:

Saint Raphael Healthcare System, Hamden Surgery Center, LLC’s request to terminate ambulatory surgical services at the Hamden Surgery Center has been approved and a Certificate of Need has been GRANTED.
 

Applicant:

Charlotte Hungerford Hospital

Docket No.:

09-31357-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 32-Slice CT Scanner with a 64-Slice CT Scanner in Torrington

Date:

April 30, 2009

Summary:

Charlotte Hungerford Hospital’s request to waive the CON requirement for the replacement of an existing 32-slice CT scanner with a 64-slice CT scanner has been APPROVED.
 

Applicant:

Yale University Health Services

Docket No.:

08-31250-CON

Project Title:

Acquisition and Operation of a Fixed-based, 1.5 Tesla-Strength MRI Scanner in New Haven

Date:

April 29, 2009

Summary:

Yale University Health Services request for the acquisition and operation of a fixed-based, 1.5 tesla-strength MRI scanner in New Haven has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Lawrence and Memorial Hospital and Yale-New Haven Hospital

Docket No.:

09-30297-MDF

Project Title:

An OHCA-initiated modification of a Certificate of Need under Docket Number 04-30297-CON, as modified by Docket Number 06-30297-MDF, to vacate Stipulation #’s 4, 6, 7, and 8 in order to discontinue data filings to the Connecticut Cardiac Data Registry and to replace Stipulation #2 regarding filing of a utilization report to OHCA.

Date:

March 20, 2009

Summary:

OHCA initiated Modification under Docket Number 09-30297-MDF has been GRANTED.

 

Applicant:

Bristol Hospital

Docket No.:

08-31266-CON

Project Title:

Acquisition through purchase of Bristol Hospital’s Existing Leased Magnetic Resonance Imaging Scanner.

Date:

April 21, 2009

Summary:

Bristol Hospital’s request to purchase its existing leased 1.5 tesla magnetic resonance imaging (“MRI”) scanner has been approved and a Certificate of Need has been GRANTED.

 

Applicant:

Danbury Hospital

Docket No.:

09-30143-MDF

Project Title:

An OHCA-initiated modification of a Certificate of Need under Docket Number 03-30143-CON, as modified by Docket Number 06-30143-MDF, Open Heart Surgery Program and Angioplasty Program to vacate Stipulation #7 in order to discontinue Danbury Hospital’s data filings to the Connecticut Cardiac Data Registry and to revise Stipulation #10 in order to clarify the continued filing of ACC-NCDR and STS-DB reports to OHCA.

Date:

April 16, 2009

Summary:

OHCA initiated Modification under Docket Number 09-30143-MDF has been GRANTED

 

Applicant:

Greenwich Hospital and Yale-New Haven Hospital

Docket No.:

08-31210-CON

Project Title:

Establish and Operate a Five-year Demonstration Elective Angioplasty Program without On-site Surgical Backup at Greenwich Hospital

Date:

April 24, 2009

Summary:

Greenwich Hospital and Yale-New Haven Hospital’s request to establish and operate a five year demonstration elective angioplasty program without on-site surgical back up at Greenwich Hospital has not been approved and a Certificate of Need has been DENIED.

 

Applicant:

Hartford Hospital

Docket No.:

08-31277-CON

Project Title:

Construction of a New Employee Parking Garage

Date:

April 17, 2009

Summary:

Hartford Hospital’s request to construct a new employee garage has been approved and a Certificate of Need has been GRANTED

 

Applicant:

Yale-New Haven Hospital, Bridgeport Hospital and Greenwich Hospital d/b/a Yale-New Haven Health Heart Institute

Docket No.:

09-30148-MDF

Project Title:

OHCA initiated modification to modify the Certificate of Need to vacate Stipulation # 2 in order to discontinue Greenwich Hospital’s data filings to the Connecticut Cardiac Data Registry; to vacate Stipulations #6 and #8 and to revise Stipulation #7 in order to clarify the filing of ACC-NCDR reports to OHCA.

Date:

March 31, 2009

Summary:

OHCA initiated Modification under Docket Number 09-30148-MDF has been GRANTED.

 

Applicant:

Radiologic Associates of Middletown, P.C., d/b/a Guilford Radiology

Docket No.:

09-31341-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 4-Slice CT Scanner with a 16-Slice CT Scanner in Guilford

Date:

April 2, 2009

Summary:

Radiologic Associates of Middletown, P.C., d/b/a Guilford Radiology’s (“Applicant’s”) request for a waiver of Certificate of Need (“CON”) requirements for replacement equipment meets the requirements for waiver of the CON process and is hereby GRANTED.

 

Applicant:

Danbury Hospital

Docket No.:

08-31194-CON

Project Title:

Proposal to Terminate Partial Hospitalization Program

Date:

March 31, 2009

Summary:

Danbury Hospital’s request to terminate its Partial Hospitalization Program has not been approved and the Certificate of Need has been DENIED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31334-WVR

Project Title:

Requirements for the Replacement of an Existing 1.5 Tesla-Strength Fixed-Based MRI Scanner in New Haven.

Date:

March 26, 2009

Summary:

Yale-New Haven Hospital’s request for a waiver of Certificate of Need (“CON”) meets the requirements for waiver of the CON process pursuant to Section 19a-639c, C.G.S. and waiver has been GRANTED.

 

Applicant:

Yale-New Haven Hospital

Docket No.:

09-31335-WVR

Project Title:

Request to Waive CON Requirements for the Replacement of an Existing 3.0 Tesla-Strength, Fixed-Based MRI Scanner in New Haven.

Date:

March 26, 2009

Summary:

Yale-New Haven Hospital’s request for a waiver of Certificate of Need (“CON”) meets the requirements for waiver of the CON process pursuant to Section 19a-639c, C.G.S. and waiver has been GRANTED.

 

Applicant:

Evergreen Endoscopy Center, LLC

Docket No.:

09-30739-MDF

Project Title: