CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE 2800 BERLIN TURNPIKE P.O. BOX 317546 NEWINGTON CONNECTICUT 06131-7546 | |
FOR RELEASE: Upon Receipt |
FOR FURTHER INFORMATION: OFFICE OF COMMUNICATIONS TELEPHONE: (860) 594-3062 Fax: (860) 594-3066 Web site:www.ct.gov/dot |
Exit 34, Route
The closure is necessary for the installation of an eighteen inch (18") drainage line across the on ramp and is part of a 4.9 million dollar contract between ConnDOT and the Dayton Construction Company, Inc. of The Route 104 south ramp to Route 15 northbound that is located in the same vicinity will remain open. Construction signs and trafficpersons will be utilized to assist motorists during the nighttime hours. Motorists are urged to use caution when traveling through the construction work zone and should allow extra travel time. Please travel at the posted speed limit to ensure the safety of both motorist and work zone personnel.