CONNECTICUT DEPARTMENT OF TRANSPORTATION

NEWS RELEASE

2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546

FOR RELEASE:November 14 , 2008
FOR FURTHER INFORMATION:
   OFFICE OF COMMUNICATIONS
   TELEPHONE: (860) 594-3062
   Fax: (860) 594-3066
   Web site:
www.ct.gov/dot

NEWINGTON, Conn.-State Transportation Commissioner Joseph F. Marie announced today that a Signal Replacement project will be performed on

Routes 6/44 at the intersections of Woodbridge St., Spruce St., Vernon St., Love Ln. and Ludlow Rd., and SR 502 @ Adams Street in Manchester. This project is scheduled to take place on or about Saturday, November 15, 2008.

Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.  The regular work schedule for this project is 5:30 a.m. to 1:30 p.m. (Saturday). 

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving through the work area.