CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7456 |
FOR RELEASE: April 18, 2012 |
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot |
The project consists of the removal and replacement of Bridge No. 00464 carrying U.S. 6 over Steele Brook in Watertown. The contractor will be installing new bridge beams, concrete deck, parapets and sidewalk as well as reconstructing the bridge approaches.
LANE CLOSURE INFO-
Alternating one way traffic using a temporary signal will be in effect until end of October 2012.
Special advisory- Bowers Street will be closed to through traffic at the intersection of U.S. 6 and Bowers Street. Local traffic on Bowers Street will enter and exit Bowers street near the intersection of U.S. 6 and Nova Street.
DOT Project no. 0153-0120 was awarded on August 22, 2011 to Mastrobattisto, Inc. at a cost of $762,372.17 and is scheduled to be completed by November 2012.