CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7456
FOR RELEASE: October 18, 2012
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

Traffic Loop Installation, Scott Swamp Road (SR 522) in Farmington
The Traffic loop installation project will be performed on a quarter mile segment of Scott Swamp Road between Route 6 and Route 10 in Farmington.  This project is scheduled to occur Tuesday, October 23, 2012 and Friday October 26, 2012.  
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 8:00 a.m. to 4:00 p.m.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.