CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7456
FOR RELEASE: September 23, 2013
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

Bridge and Road Maintenance work Route 25, NB and SB in Trumbull
The project consists of concrete repairs to Route 25, NB and SB in Trumbull.  This project is scheduled to occur on Monday, September 23, 2013 through Friday, October 18, 2013.
Motorists can expect lane closures on Route 25, NB, Between Exit 9 (Daniels Farm Road) and Route 111. SB, Between Route 111 and Exit 8 (Route 15, Merritt Parkway) in Trumbull. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 9:00 am to 3:00 pm (Monday – Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.