CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7456
FOR RELEASE: March 11, 2013
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

New Schedule for Installation of Overhead Signs on Route 20 and Bradley International Airport Connector in the Towns of Windsor, Windsor Locks and East Granby
The Connecticut Department of Transportation is announcing that overhead sign replacement along Ct. Route 20 and Bradley International Airport Connector in the Towns of Windsor, Windsor Locks and East Granby is scheduled for Monday, March 11, 2013, through Thursday, March 21, 2013.

The work involves the installation of new signs and supports for overhead signing spanning the roadway along Route 20 and SR401 (Bradley International Airport Connector).  Work will also include the removal of existing support structures and signs in areas as well.

DOT Project No. 0165-0392/ 170-2692 was awarded to Allen David Industries on March 25, 2011 at a cost of $2,482,708.00 and is scheduled to be completed in April 2013.

LANE CLOSURE INFO-

Route 20

6 p.m. to 6 a.m. on Monday (3/11/13), Tuesday (3/12/13), Wednesday (3/20/13), Thursday (3/21/13)

SR 401 (Bradley Connector)

6 p.m. to 6 a.m. on Wednesday (3/13/13), Thursday (3/14/13), Monday (3/18/13), Tuesday (3/19/13)

Traffic will be stopped for a period of up to ten minutes during the hours of 12:01 a.m. and 5 a.m. to allow for removal and installation of supports and signs.

OTHER LANE CLOSURE INFO –

Route 20

Monday – Friday 10 a.m. to 3 p.m.

SR 401 (Bradley Connector)

Monday – Friday 9 a.m. to 3 p.m.

Bradley Airport Terminal A

Arrivals Level (Upper Level) 8 p.m. to 4 a.m.

Departure Level (lower Level) from 10 p.m. to 6 a.m.