CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7456
FOR RELEASE: August 22, 2013
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

Traffic Stoppages Scheduled for Interstate 95 Between Exits 4 and 5 To Install New Steel for the Bridge Carrying Lockwood Lane over Interstate 95 in the Town of Greenwich

      The Connecticut Department of Transportation is announcing that traffic traveling I-95 between Exit 4 (Indian Field Road) and Exit 5 (U.S. Route 1) will be stopped for a period not to exceed 10 minutes for erection of the structural steel.  The work is scheduled to occur between the hours of 11 a.m. and 5 a.m. Thursday, August 22 and September 5 for I-95 southbound and Tuesday, September 3, 2013 for I-95 northbound.  All work is weather permitting.

      The project consists of full replacement of the Bridge No. 00017 that carries Lockwood Lane over the interstate.  The work includes a new bridge deck, bridge bearings, parapets, protective fence and sidewalks.  The work also includes substructure repairs involving concrete patching and crack filling at the abutments and piers.

Traffic stoppages scheduled between the hours of 11 p.m. and 5 a.m.

·         Southbound direction of 1-95 traffic on August 22 

·         Northbound direction of I-95 on September 3 

·         Southbound direction of I-95 on September 5

LANE CLOSURE INFO –

Monday-Thursday 

NB 8 p.m. to 6 a.m.

SB 6 p.m. to 6 a.m.

Friday

NB 8 p.m. to 8 a.m. Saturday

SB 6 p.m. to 10 a.m. Saturday

Saturday 

NB & SB 5 p.m. to 11 a.m. Sunday

Sunday 

NB 4 p.m. to 6 a.m. Monday

SB 9 p.m. to 6 a.m. Monday