CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546 |
FOR RELEASE: September 14, 2014 |
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot |
Nighttime Maintenance-Various Bridges on I-95 NB in Fairfield
The work consists of bridge maintenance on the bridges listed below. This work is scheduled to occur from 9:00 p.m. to 5:00 a.m. on Sunday, September 14, 2014 to the morning of Friday, October 24, 2014. (Sundays through Fridays):
Bridge #74 over Westway Rd. (22.63)
Bridge #75 over Center St. (22.88)
Bridge #76 over Old Post Rd. (23.05)
Bridge #77 over US 1 Post Rd. (23.12)
Bridge #79 over Bronson Rd. (23.72)
Bridge #80 over Mill River (23.87)
Bridge #81 over Pine Creek (24.19)
Bridge #82 over Mill Plain Rd. (24.38)
Bridge #83 over Unquowa Ave. (24.71)
Bridge #84 over Round Hill Rd. (25.03)
Bridge #85 over Rt. 135 No. Benson Ave. (25.21)
Bridge #88 over U.S. 1 (25.96)
Bridge #89 over Grasmere Ave. (26.02)
Bridge #90 over New England Ave. (26.28)
Bridge #75 over Center St. (22.88)
Bridge #76 over Old Post Rd. (23.05)
Bridge #77 over US 1 Post Rd. (23.12)
Bridge #79 over Bronson Rd. (23.72)
Bridge #80 over Mill River (23.87)
Bridge #81 over Pine Creek (24.19)
Bridge #82 over Mill Plain Rd. (24.38)
Bridge #83 over Unquowa Ave. (24.71)
Bridge #84 over Round Hill Rd. (25.03)
Bridge #85 over Rt. 135 No. Benson Ave. (25.21)
Bridge #88 over U.S. 1 (25.96)
Bridge #89 over Grasmere Ave. (26.02)
Bridge #90 over New England Ave. (26.28)
This project is included in the Department of Transportation’s 2014 bridge maintenance program to support state forces with bridge repairs and is being performed by Costello Industries.
LANE CLOSURE INFO
Motorists can expect lane closures on I-95, NB, between Exit 18 (SSR 476) and Exit 24 (U.S. 1), in Fairfield. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 9:00 p.m. to 5:00 a.m., Sunday evening through Friday morning.
Motorists can expect lane closures on I-95, NB, between Exit 18 (SSR 476) and Exit 24 (U.S. 1), in Fairfield. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 9:00 p.m. to 5:00 a.m., Sunday evening through Friday morning.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.