CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546 |
FOR RELEASE: April 1, 2016 |
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot |
Nighttime Bridge Maintenance, I-91 South in Wallingford
The project consists of bridge maintenance to the I-91 southbound Route 150 overpass (Bridge 03128) in Wallingford. This project is scheduled to occur from 9:00 p.m. to 6:00 a.m. on Monday, April 4, 2016 to the morning of Friday, April 15, 2016.
LANE CLOSURE INFO
Motorists can expect lane closures on I-91 south at Exit 14 (SR 738, East Center Street) and
Exit 13 (SR 702) in Wallingford. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 9:00 p.m. to
6:00 a.m. (Monday through Friday).
Motorists can expect lane closures on I-91 south at Exit 14 (SR 738, East Center Street) and
Exit 13 (SR 702) in Wallingford. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 9:00 p.m. to
6:00 a.m. (Monday through Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.