CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546 |
FOR RELEASE: September 1, 2017 |
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot |
Bridge Maintenance along Route 9 in Essex
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 9 northbound and southbound in Essex, Monday, September 18, through Friday, September 29, 2017.
· Bridge #03341-Rte. 153 overpass-3.87
· Bridge #03342–Rte. 153 overpass-3.88
· Bridge #03343-Rte. 154 overpass-3.94
The work will be conducted by Dynamic Surface Applications.
LANE CLOSURE INFO
Motorists can expect left lane or right lane closures on Rt. 9 SB between Exit 4 to Exit 3 & Rte. 9 NB
between Exit 2 and Exit 3. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 8:00 a.m. to 4:00 p.m. during the week.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.