CONNECTICUT DEPARTMENT OF TRANSPORTATION
NEWS RELEASE
2800 BERLIN TURNPIKE P.O. BOX 317546
NEWINGTON CONNECTICUT, 06131-7546
FOR RELEASE: February 22, 2018
FOR FURTHER INFORMATION:
OFFICE OF COMMUNICATIONS
TELEPHONE: (860) 594-3062
FAX: (860) 594-3065
WEB SITE: www.ct.gov/dot

Repair work at Cos Cob Bridge over Mianus River
                                                                           
The Connecticut Department of Transportation is announcing a temporary deviation from the drawbridge operation regulations (33 CFR 117.5 and 33 CFR 117.209) due to ongoing repair work at Cos Cob Bridge over Mianus River at Greenwich, Connecticut. Under this deviation, the draw of the bridge is authorized to operate as follows from 8 a.m. April 10, 2018 to 8 a.m. on Monday, May 14, 2018:
From 8 a.m. Monday to 4 p.m. Friday, the draw will remain closed to navigation. From 4:01 p.m. Friday to 7:59 a.m. Monday, the draw shall open with 24 hours advance notice. Vessels capable of passing under the bridge in the closed to navigation position shall be allowed to pass at all times.