Welcome to the webpage for State Project No. 0141-0158, Replacement of Bridge No. 03474, Route 200 (Thompson Hill Road) over Interstate 395, in the Town of Thompson.

A virtual public informational meeting for the project will be held on Monday, July 1 at 7:00 p.m.

The purpose of this meeting is to provide the community an opportunity to learn about the proposed project and allow an open discussion of any views and comments concerning the proposed improvements. A Q&A session will immediately follow the presentation.

The purpose of the project is to address the existing structural deficiencies of Bridge No. 03474

This project will involve the complete replacement of Bridge No. 03474. The replacement bridge will consist of two single-span superstructures supported by Geosynthetic Reinforced Soil – Integrated Bridge System (GRS-IBS) abutments and a GRS-IBS common abutment. The new out-to-out width of the bridge will be 52’-6”. The proposed superstructure for this alternative will have two single-span lengths of 85’-0” each and consist of eight steel-rolled beams with a composite deck slab, 3-inch wearing surface, and 42-inch-high vertical shape parapets on both sides.

Right-of-way impacts associated with the proposed project are not anticipated

Construction is anticipated to begin Fall 2026 based on the availability of funding and approval of permit(s)The estimated construction cost for this project is approximately $13,500,000

The proposed project plans can be viewed here.

Please register for the virtual public information meeting at this Zoom Link.

Registration is required to participate. Once registered, you will receive a confirmation email with a link to access the meeting.

This meeting will also be livestreamed on YouTube: portal.ct.gov/ctdotvpimarchive

Members of the public can submit comments and questions during the two-week public comment period following the meeting. Please direct comments and questions by July 15, 2024 to: 

Closed captioning will be available. Non-English translation options will be available on Zoom and YouTube. The recording will also be available on CTDOT’s YouTube Virtual Public Information Meeting playlist: portal.ct.gov/ctdotvpimarchive.

Persons with limited internet access, use the call-in number 877-853-5257 and enter Meeting ID 853 4546 4567. Persons with limited internet access may also request that project information be mailed to them within one week by contacting Isuf Vlashi, Project Engineer (860-594-3389; isuf.vlashi@ct.gov).

Persons with hearing and/or speech disabilities may dial 711 for Telecommunications Relay Services (TRS).

Language assistance may be requested by contacting the CTDOT’s Language Assistance Call Line (860) 594-2109. Requests should be made at least five business days prior to the meeting. Language assistance is provided at no cost to the public and efforts will be made to respond to timely requests for assistance.

Additional Information for Public:

Voluntary Feedback Survey

After the meeting, we hope you will take a few extra minutes to fill out our brief survey.

DOT Office of Equity – Title VI Program

MS-4 Municipal Separate Storm Sewer Systems