Route 8 Deficiencies and Needs Study Int. 22-30

Prepared by the Connecticut Department of Transportation in cooperation with Vanasse Hangen Brustlin, Inc (VHB), the Valley Council of Governments (VCOG) and the Council of Governments of Central Naugatuck Valley (COGCNV).

 

Final Report

Cover and Table of Contents (Pdf_Icon_Small 0.2 MB)

Chapters 1 and 2 – Introduction and Existing Transportation Conditions (Pdf_Icon_Small 1.5 MB)

Chapter 3 – Existing Environmental Conditions (Pdf_Icon_Small 0.2 MB)

Chapters 4 and 5 – Future Transportation Conditions and Deficiencies and Needs Summary (Pdf_Icon_Small 0.9 MB)

Chapters 6 and 7 – Alternative Screening Process and Recommendations (Pdf_Icon_Small 25.5 MB)

 

Final Report Appendices

Appendix A - Cost Estimates (Pdf_Icon_Small 0.9 MB)

Appendix B - Correspondence (Pdf_Icon_Small 1.2 MB)

 

Interim Technical Memorandum #2

Screening Analysis of Alternatives (Pdf_Icon_Small 32.5 MB)

 

Interim Technical Memorandum #1

Cover and Table of Contents (Pdf_Icon_Small 320 KB)

Chapters 1 and 2 – Introduction and Existing Transportation Conditions (Pdf_Icon_Small 500 KB)

Chapter 3 – Existing Environmental Conditions (Pdf_Icon_Small 780 KB)

Chapters 4 and 5 – Future Transportation Conditions and Deficiencies and Needs Summary (Pdf_Icon_Small 300 KB)

 

Interim Technical Memorandum #1 Appendices

Existing and Future Transportation Conditions Graphics (Pdf_Icon_Small 8.4 MB)

Existing Environmental Constraints Mapping (Pdf_Icon_Small 9.0 MB)