Danbury Branch Electrification Feasibility Study

Phase I Final Report Executive Summary   
Notice of Intent
Coordination Plan
Final Scoping Report
Rail Infrastructure Report - Existing Conditions
Existing Conditions Report
Train Simulation Report for Alternatives  
Transit-Oriented Development Final Report
Technical Summary Report
 
 
Environmental Technical Memorandum: Existing Conditions
Cover and Introduction
Section 1 - Topography, Geology, and Soils
Section 2 - Noise and Vibration
Section 3 - Air Quality
Section 4 - Energy
Section 5 - Biological Diversity
Section 6 - Threatened and Endangered Species
Section 7 - Wetlands
Section 8 - Floodplains and Floodways
Section 9 - Historic Resources
Section 10 - Archeological Resources
Section 11 - Prime Farmland and Active Farmland
Section 12 - Land Use
Section 13 - Hazardous Contamination
Section 14 - Surface and Groundwater Resources
Section 15 - Public Recreational/4(f)/6(f) Lands
Section 16 - Socioeconomics and Environmental Justice  
Section 17 - Scenic Roads
Section 18 - Visual Resources
    
Environmental Technical Memorandum: Impact Reports
Section 1 - Topography, Geology, and Soils
Section 2 - Noise and Vibration
Section 3 - Air Quality
Section 4 - Energy
Section 5 - Biological Diversity
Section 6 - Threatened and Endangered Species
Section 7 - Wetlands
Section 8 - Floodplains and Floodways
Section 9.10 - Historic and Archaeological Resources
Section 11 - Prime Farmland and Active Farmland
Section 12 - Land Use
Section 13 - Hazardous Contamination
Section 14 - Surface and Groundwater
Section 15 - Public Recreational/4(f)/6(f) Lands
Section 16 - Socioeconomic and Environmental Justice
Section 17 - Scenic Roads
Section 18 - Visual Resources

 

Engineering Feasibility Report
Engineering Feasibility Report Volume I
Engineering Feasibility Report Volume II