During the design of this project, many residents have submitted drawings and sketches to illustrate their proposed design. The image below shows the two completed projects on Main Street, as well as the proposed design for Project 0082-0316 – Reconfiguration of the Route 17 On-Ramp to Route 9 North. This image was designed to be downloaded, marked up with ideas, and sent back to DOT.Rte9Middletown@ct.gov at the address below.