TABLE OF CONTENTS |
|||
|
chapter 100 - overview of the Assignment |
|||
|
101 |
assignment meeting |
||
| 101.01 | description of the project | ||
| 101.02 | basic project assignment | ||
| 101.03 | affirmative action | ||
| 101.04 | scope of the work | ||
| 101.05 | fee proposal | ||
| 101.06 | agreement | ||
| 102 | material to be furnished by the department | ||
| 102.01 | general material furnished at the assignment meeting | ||
| 102.02 | project specific material furnished at the assignment meeting or as it becomes available | ||
| 103 | reference material | ||
| 104 | material to be furnished by the consulting engineer | ||
| 105 | control of the work | ||
| 106 | relationship with other agencies | ||
| 107 | attendance at meeting and public hearing | ||
| 107.01 | attendance at meeting and public hearing | ||
| 107.02 | public hearing | ||
| 107.03 | construction stage | ||
| 108 | responsibility for accuracy of work | ||
| 109 | entry upon private property | ||
|
chapter 200 - administrative procedures File Size: 17 KB |
![]() | ||
| 201 | progress reports | ||
| 201.01 | original assignment | ||
| 201.02 | supplement assignment | ||
| 201.03 | compliance certification for executive order no. 17 | ||
| 202 | Invoices | ||
| 202.01 | partial payments | ||
| final payment | |||
| review of shop plans | |||
| services during construction | |||
| subcontracted work | |||
| direct costs | |||
| sub consultant invoice summary sheet | |||
| 203 | extra work | ||
| 204 | supplemental engineers | ||
| 205 | affirmative action | ||
| 206 | conditions for subcontract of work | ||
| 207 | burden, fringe and overhead | ||
|
chapter 300 - design development File Size: 42 KB |
![]() | ||
| 301 | design development | ||
| 301.01 | establishment of milestone dates | ||
| 301.02 | preliminary design submission | ||
| 301.03 | incorporation of department's review comments | ||
| 302 | preliminary engineering studies phase | ||
| 303 | preliminary design phase | ||
| 303.01 | baseline development | ||
| 303.02 | preliminary design submission | ||
| 303.03 | information to be shown on preliminary design plans, profiles, and typical sections | ||
| 303.04 | information to be contained in the preliminary design report | ||
| 303.05 | structure type studies | ||
| 303.06 | rehabilitation study reports | ||
| 303.07 | design exception documentation | ||
| 304 | final design phase | ||
| 304.01 | semi-Final design submission | ||
| 304.02 | structure layout for design (SL/D) submission | ||
| 304.03 | final plans for review submission | ||
| 304.04 | final design submission | ||
| 304.05 | post-Final design submission | ||
| 304.06 | addendum preparation | ||
| 305 | construction stage | ||
| 306 | intermediate submission | ||
| 307 | progress prints | ||
| 308 | miscellaneous material | ||
| 309 | presentation of material at meetings | ||
|
File Size: 66 KB |
![]() | ||
| 401 | geometry | ||
| 401.01 | basic standards | ||
| 401.02 | horizontal geometry | ||
| 401.03 | vertical geometry | ||
| 401.04 | combination of horizontal and vertical geometry | ||
| 401.05 | interchanges | ||
| 401.06 | at-grade intersections | ||
| 401.07 | median | ||
| 401.08 | cut and fill slopes | ||
| 401.09 | side slope transitions | ||
| 401.10 | super elevation | ||
| 401.11 | driver expectancy | ||
| 402 | roadway | ||
| 402.01 | grade lists | ||
| 402.02 | plotting templates cross sections | ||
| 402.03 | plotting slope lines | ||
| 402.04 | pavements and sub base | ||
| 402.05 | sidewalks | ||
| 402.06 | median opening | ||
| 402.07 | driveways | ||
| 402.08 | sidewalk ramps | ||
| 402.09 | fencing | ||
| 402.10 | concrete steps | ||
| 402.11 | object markers | ||
| 402.12 | noise barrier walls | ||
| 403 | structure | ||
| 403.01 | lighting on structures | ||
| 403.02 | signing on structures | ||
| 403.04 | highway grade separations | ||
| 403.05 | scour analysis | ||
| 403.06 | navigable waters | ||
| 403.07 | railroad structures | ||
| 403.08 | soils | ||
| 403.09 | utilities | ||
| 403.10 | post design responsibilities | ||
| 404 | hydraulics and drainage | ||
| 404.01 | hydraulics | ||
| 404.02 | drainage | ||
| 404.03 | drainage design submissions | ||
| 405 | soils and foundation | ||
| 405.01 | general | ||
| 405.02 | soils and foundation engineering liaison | ||
| 405.03 | data for soils and foundations engineering studies and design | ||
| 405.04 | engineering studies and design | ||
| 405.05 | soils and foundation engineering reports | ||
| 406 | traffic | ||
| 406.01 | signals | ||
| 406.02 | signing | ||
| 406.03 | pavement markings | ||
| 406.04 | illumination | ||
| 406.05 | maintenance and protection of traffic | ||
| 407 | roadside development | ||
| 408 | survey | ||
| 408.01 | progress submission | ||
| 408.02 | changes in field conditions | ||
| 409 | rights of way | ||
| 409.01 | title search | ||
| 409.02 | 13A-57 mapping | ||
| 409.03 | property maps | ||
|
chapter 500 - supportive documents File Size: 24 KB |
![]() | ||
| 501 | supportive documents | ||
| 502 | computations | ||
| 502.01 | horizontal and vertical alignment | ||
| 502.02 | drainage computations | ||
| 503 | quantities | ||
| 503.01 | breakdown of quantities | ||
| 503.02 | summary of quantities | ||
| 504 | specifications | ||
| 504.01 | standard specifications for roads, bridges, and incidental construction | ||
| 504.02 | supplemental specification | ||
| 504.03 | special provisions | ||
| 504.04 | railroad | ||
| 504.05 | municipalities and utility companies | ||
| 504.06 | control of bid master file | ||
| 505 | proposal estimate | ||
| 506 | federal estimate | ||
| 507 | design report | ||
| 508 | contract time analysis | ||
|
chapter 600 - coordination with utilities File Size: 19 KB |
|||
| 601 | coordination with utilities | ||
| 602 | identification of affected utilities | ||
| 603 | submission of plans to utilities | ||
| 604 | design/utility meeting | ||
| 604.01 | notice of environmental permits | ||
| 604.02 | construction conflicts | ||
| 604.03 | test pits | ||
| 604.04 | engineering cost estimates | ||
| 604.05 | time and material constraints | ||
| 604.06 | utility work by department's contractor | ||
| 604.05 | time and material constraints | ||
| 604.06 | utilities work by department's contractor | ||
| 604.07 | Utility plans, specifications and estimates | ||
| 604.06 | utility work by department | ||
| 605 | cost sharing | ||
| 606 | railroad involvement | ||
| 606.01 | railroad meeting and clearances | ||
| 606.02 | transmittal of plans to railroad for agreement | ||
|
chapter 700 - completion of Plans File Size: 33 KB |
![]() | ||
| 701 | completion of plans | ||
| 702 | title sheet | ||
| 703 | index plan and profile | ||
| 704 | detailed estimate sheet | ||
| 705 | typical cross section | ||
| 706 | miscellaneous details | ||
| 707 | drainage details | ||
| 708 | intersection grading plans | ||
| 709 | survey ties - curve data | ||
| 710 | subsurface boring data | ||
| 711 | plan sheets | ||
| 712 | profile sheets | ||
| 713 | structure sheets | ||
| 714 | traffic plans | ||
| 714.01 | pavement marking plans | ||
| 714.02 | signal plans | ||
| 714.03 | signing plans | ||
| 714.04 | illumination plans | ||
| 715 | detour plans | ||
| 716 | stage construction plans | ||
| 717 | turning plan | ||
| 718 | sedimentation and erosion control plan | ||
| 719 | cross section | ||
| 720 | utility plans | ||
| 720.01 | construction work performed by utility company | ||
| 720.02 | construction work included in department's project | ||
| 721 | standard drawing | ||
|
chapter 800 - environmental activities File Size: 25 KB |
![]() | ||
| 801 | introduction | ||
| 802 | wetland delineation/mitigation | ||
| 802.01 | wetland delineation | ||
| 802.02 | mitigation and wetland creation | ||
| 802.03 | fish passage | ||
| 803 | department of army | ||
| 804 | Connecticut department of environmental protection regulatory programs | ||
| 804.01 | jurisdiction | ||
| 804.02 | tidal wetland | ||
| 804.03 | structures and dredging | ||
| 804.04 | coastal zone management consistency | ||
| 804.05 | inland wetlands and watercourses | ||
| 804.06 | stream channel enrichment line | ||
| 804.07 | water diversion | ||
| 804.08 | flood management | ||
| 804.09 | discharges of storm water and dewatering wastewaters associated with construction activities | ||
| 805 | united states coast guard | ||