CTDOT Construction Advisories
Page 5 of 235
-
Bridge Beam End Painting and Steel Repair
Date Posted: 4/12/2019
Last Updated:
-
Bridge Beam End Painting, Steel Repairs and Bearing Replacement / Various Bridges
Date Posted: 4/12/2019
Last Updated:
-
Date Posted: 4/12/2019
Last Updated:
-
Date Posted: 4/12/2019
Last Updated:
-
Bridge Closure Scheduled for Route 1 (Tomlinson Bridge) Over the Quinnipiac River in New Haven
Date Posted: 4/12/2019
Last Updated:
-
Bridge Closure, Route 130 (Stratford Ave.) over the Pequonnock River in Bridgeport
Date Posted: 4/12/2019
Last Updated:
-
Bridge Deck Joint Inspection along Route 8 and I-95
Date Posted: 4/12/2019
Last Updated:
-
Bridge Deck Joint Inspection along Route 8 and I-95
Date Posted: 4/12/2019
Last Updated:
-
Bridge inspection - Route I-95 (northbound) between Exits 69 and 70 in Old Saybrook
Date Posted: 4/12/2019
Last Updated:
-
Bridge Inspection - I-84 (eastbound and westbound) between Exits 46 and 49 in Hartford
Date Posted: 4/12/2019
Last Updated:
-
Bridge Inspection - I-84 (Eastbound) between Exits 53 and 58 in East Hartford
Date Posted: 4/12/2019
Last Updated:
-
Bridge Inspection - I-95 (northbound) between Exits 82 and 84 in New London
Date Posted: 4/12/2019
Last Updated:
-
Date Posted: 4/12/2019
Last Updated:
-
Bridge Inspection - Route 15 (Northbound) between Exits 52 and 55 in Stratford (Sikorsky Brisge)
Date Posted: 4/12/2019
Last Updated:
-
Bridge inspection - Route I-84 (eastbound) between Exits 57 and 59 in East Hartford
Date Posted: 4/12/2019
Last Updated: