New Haven - Hartford - Springfield
Commuter Rail Implementation Plan
Commuter Rail Implementation Plan
All documents on this page are in Adode PDF format. To down load a free version of Adode reader visit the Adobe website.
Recommended Action Summary Paper (October, 2004)
- Summary Paper (590 KB)
- New Haven State Street and North Haven Station Drawings (3.4 MB)
- Wallingford Station Drawings (3.6 MB)
- Meriden and Berlin Station Drawings (5.2 MB)
- Newington, Hartford and Windsor Station Drawings (5.2 MB)
- Windsor Locks and Enfield Station Drawings (3.6 MB)
Transportation Strategy Board Summary Paper (August, 2004)
The Alternatives Report (August, 2004) includes the following chapters:
- Cover, Table of Contents, Lists of Figures and Tables, Chapter 1 (345 KB)
- Chapter 2 - Minimum Build Scenario (614 KB)
- Chapter 3 - Maximum Build Scenario (782 KB)
- Chapter 4 - Connecting Bus Service Plan for Maximum Build Scenario PART 1
(1.8 MB) - Chapter 4 - Connecting Bus Service Plan for Maximum Build Scenario PART 2
(2.1 MB) - Chapter 5 - Natural Resource Secondary Source Review for Maximum Build Scenario (978 KB)
- Chapter 6 - Implementation Alternatives (119 KB)
The Existing Conditions Report (March, 2003) includes the following chapters:
- Cover, Table of Contents, Lists of Figures, Tables, Acronyms (338 KB)
- Chapter 1 - Introduction (672 KB)
- Chapter 2 - Project Evaluation Criteria (212 KB)
- Chapter 3 - Existing Rail Corridor Inventory (2.7 MB)
- Chapter 4 - Existing Infrastructure System Inventory (4.1 MB)
- Chapter 5 - Socio-Economic Inventory (1.9 MB)
- Chapter 6 - Environmental Inventory (6.1 MB)
- Chapter 7 - Ridership, Fare Revenue, and Cost Database (424 KB)
- Appendices (1.5 MB)