Inspections, Maintenance and Repairs
The following are all actions that were performed on the various systems of the 25 Sigourney Street property.
Post Water Infiltration Treatment Report 10-14-2008
Investigate Reported Areas of Water Infiltration 11-7-2008
Water Infiltration Field Investigation Report 12-12-2008
Investigate Reported Areas of Water Infiltration 9-21- 2007
Study for Drainage Plane 7-21-2006
NIOSH Interim Letter IX 3-12-2008
NIOSH Interim Letter VIII 10-12-2007
Outside Air Quantity Study - BVH
Balcony Flood Testing Investigation Report 4-13-2009
Building Envelope Study Appendix C 5-15-1998
Building Condition Survey 1992
Building Envelope Study 5-15-1998
Condition Reassessment & Post Tension Strand Evaluation 10-13-2011
Flashing, Lintels & Sealant Investigation Report 6-26-2009
Life Safety Code Systems Compliance - 2 Drawings 8-20 and 1-2-2013
Life Safety Code Systems Compliance 8-20 and 1-2-2013
Parking Garage Condition Appraisal Report 8-27-2010
Parking Garage Study 7-28-1998
Removal Summary with tables TRC Report for weekend of 2-10-2006
Structural Engineering Report 8-25-1994
Study for Outside Air Quantity 8-21-2006
Exterior Repairs - Building Envelope
Roof Replacement and Entry Plaza Repairs