Bureau of Policy and Planning
Office of Environmental Planning

Natural Resource Planning Unit
+ Environmental Permitting Unit
(formerly Water & Natural Resources)

Environmental Resource
Compliance Unit
(formerly Water & Noise Compliance)

DOT Line Image

Water & Natural Resources Picture 1

Back to Office Environmental Planning

General Information

Distribution List
OEP/EPC Distribution List

Planning/Engineering Directive:
Project Permitting and Risks –
Roles and Responsibilities Chart

Environmental Coordination & Permitting Process Maps
Permit Thresholds Guidance Document

Expedited PNDF Directive

Other Policies, Directives, Bulletins, and Programs:

Standard Operating Procedure for Determining Ordinary High Water
Permit Review and Regulatory Processing Timelines
Assignment of Coordinated Environmental Roles
CTDOT's  MS4 Stormwater Quality Management Program

Natural Resource Planning
Performs early screening of Department projects for resource concerns, and coordinates projects with State and federal resource agencies such as National Marine Fisheries Service (NMFS), U.S Coast Guard (USCG), and DEEP Fisheries and Wildlife Divisions.  Oversees and performs habitat evaluations and coordination required under the Endangered Species Act. Performs wetland delineations and oversees stewardship of the Department’s Mitigation Sites.

DOT Line Image

Permit Needs Determination Form

Fisheries Information

NOAA NMFS Essential Fish Habitat

NOAA Endangered Species Act Sec. 7

DEEP NDDB Coordination

ESA Northern Long-Eared Bat (NLeB)

Army Corps Sec. 408 Navigation

Army Corps

pic8.jpg

 

               

pic9.png

 

              

pic10.png

Back to Top

Environmental Permitting Unit
Determines permitting needs for Department projects and acquires permit approvals for State designed projects. Oversees and reviews consultant prepared applications for content and accuracy. Acts as main liaison with federal and State regulatory agencies such as U.S. Army Corps of Engineers (USACE), U.S. Environmental Protection Agency (EPA), and the Connecticut Department of Energy and Environmental Protection (CTDEEP). Assists in field work associated with wetland and water resource identification, habitat assessments and mitigation requirements.

Interagency Coordination Meeting (ICM)

(for SLBP/LOTCIP projects, see EPC Unit Section)

Permit Plan Sets

U.S. Army Corps of Engineers

 

pic7.jpg
 
pic5.jpg

 

CT DEEP Land and Water Resources Division (LWRD)

Note: It is the preparer’s responsibility to use the most up-to-date forms when applying for a permit. Refer to DEEP LWRD Permit Applications webpage for the most recent versions of permit application forms.

Note: The CTDOT Environmental Permitting Unit has developed guidance materials to aid in the preparation of CTDOT applications for DEEP permits.  Contact the Environmental Permitting Unit for guidance materials.

Sample Permit Transmittal Memos/Letters

USACE Permit Application Cover Letter (Word)
DEEP Permit Application Cover Memo (Word)

 

DOT Hydraulics and Drainage: Permitting Forms and Links

Back to Top

Environmental Resource Compliance
Performs environmental surveillance of construction activities to ensure compliance with permits; acts as liaison with State and federal regulatory agencies during construction. Oversees mitigation measures during construction. Ensures compliance with applicable State and federal laws and regulations for Maintenance activities across the State. Conducts and oversees the Department’s Noise program including conducting noise studies and maintaining an inventory of noise walls in the State. Acts as the lead Planning unit for stormwater compliance issues and is responsible for planning and mapping aspects of the Department’s MS4 permit.
Eastern Box Turtle

Manuals/Guidance Documents

 

Specifications / Special Provisions / Details

Fisheries

Back to Top

  • Seeding
  • OEP Landscaping Submittal Templates
  • Noise

     - Ground-Mounted Sound Barrier

     - Structure-Mounted Sound Barrier

 

  • Qualified Product List

- Qualified Products List

 

  • E&S Control Specifications
  • E&S Control Highway (Standard/Guidesheets)
  • Invasive Species Specifications
 

DOT Line Image

Permit Compliance Forms & Start Notices

p12.jpg p13.jpg

DOT Line Image

Construction Stormwater Resources

Low Impact Development (LID)

Construction Stormwater Permit

Stormwater Pollution Control Template

Design Build - Stormwater Pollution Control Template

CTDOT Project Example Registrations

EZ File

p1.jpg
p1.jpg

DOT Line Image

Statewide General Permits and Resources for Highway and Rail Operations

pic7.jpg

 

 

pic3.jpg

Back to Top

Engineering Project Coordination
The Bureau of Engineering & Construction’s Engineering Project Coordination (EPC) unit works in partnership with the Office of Environmental Planning (OEP). OEP and EPC work together toward the common goal of preserving environmental and cultural resources through the Department’s capital program.

 

Municipal Interagency Coordination Meeting (ICM) - (for SLBP & LOTCIP)

 

EPC’s three key roles are:

  • Engineering/Environmental Representation - EPC works to help OEP and regulators better understand Department engineering requirements and processes. EPC simultaneously helps engineers understand the balance between design criteria, funding, schedules and environmental requirements/commitments.

Bobcat
  • New rules, regulations and procedures - EPC reviews new proposals for environmental rules/regulations and procedures from the engineering standpoint and potential implications for the Department.

  • Improving and simplifying processes – EPC works with OEP and regulatory staff on environmental requirements and processes for areas for improvement. EPC works jointly with OEP to develop guidance, templates, sample plans/details, and other tools for engineering staff to ensure project quality, consistency and permit-ability.