I-95 Branford to Rhode Island Feasibility Study

 
 
Final Report
You may download the report as a complete document or as individual sections via the links below. Allow for download time; please note that many of the MAPS are about 2 megabytes each:
Complete Document (2.6 MB)
Table of Contents

 

Chapter One - Introduction (Report)
Study area map

 

Chapter Two - Existing infrastructure System Inventory (Report)
Map - Corridor Geometric and Safety Review
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour
Map - Intersection Capacity Analysis - Evening Peak Hour
Map - Exisitng Bicycle Routes - I-95 Corridor Study Area

 

Chapter Three - Future Transportation Conditions (Report)
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour 2025 No Build Condition
Map - Intersection Capacity Analysis - Evening Peak Hour 2025 No Build Condition

 

Chapter Four - Existing Environmental Conditions (Report)
Map - Surface Water Resources
Map - Ground Water Resources
Map - Farmland Soils
Map - Cultural and Sensitive Environmental Resources
Map - Landuse
Map - Environmental Justice Census Tracts/Block Groups

 

Chapter Five - Improvement Concepts Analysis (Report)
Map - Conceptual Typical Sections - 4-lane Section to 6-lane Section

Maps -Corridor Improvement Concepts- use links below
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour 2025 Build Condition
Map - Intersection Capacity Analysis - Evening Peak Hour 2025 Build Condition

 

Chapter Six - Implementation Plan (Report)
Maps - Near Term Intersection Improvement Concepts

6-1-1 Exit 55 locale

6-1-2 Exit 59 locale

6-1-3 Exit 63 locale

6-1-4 Exit 64 locale

 

Maps - Near Term Interchange Improvement Concept

6-2-1 Exit 59 locale

6-2-2 Exit 81(s) locale

6-2-3 Exit 81(n) locale

6-2-4 Exit 82 locale

6-2-5 Exit 82 (continued) locale

6-2-6 Exit 82A locale

6-2-7 Exit 90 locale

Map - Near Term Median Improvements

Near Term Implementation Plan

Map - Long Term Implementation Plan

 

 
Chapter Seven - Products of Public Participation
Public Comments 1
Public Comments 2
Public Comments 3
Public Comments 4
Public Comments 5
Public Comments 6
Public Comments 7
Public Comments 8

 
 
Appendices
Transit Service Enhancements Analysis
Feasibility of Managed Lanes
Existing Infrastructure System Inventory
Future Transportation Conditions
Improvement Concepts Analysis

 

 
Commonly Used Abbreviations
Identification of Commonly Used Abbreviations

 

 
Technical Advisory Committee Meetings
Study Advisory Committee Meeting #1 - November 2002
Study Advisory Committee Meeting #2 - April 2003
Study Advisory Committee Meeting #3 - June 2003
Study Advisory Committee Meeting #4 - October 2003
Transit Report Meeting - September 18, 2003
Study Advisory Committee Meeting #5 - February 2004

 

 
Local Outreach Meetings
1 - South Central Regional Council of Governments
2 - Southeastern Connecticut Council of Governments
3 - Connecticut River Estuary Regional Planning Agency
4 - Town of New London
5 - Town of Waterford
6 - Town of Stonington
7 - Town of Groton
8 - Town of East Lyme
9 - Town of Old Saybrook
10 - Town of Madison
11 - Town of Clinton
12 - Town of Guilford
13 - Town of Branford
14 - Town of Old Lyme
15 - Town of Westbrook
16 - Mohegan Tribe
17 - Mashantucket Pequot Tribe
18 - Town of Guilford