Chapter One - Introduction (Report)
Study area map
Chapter Two - Existing infrastructure System Inventory (Report)
Map - Corridor Geometric and Safety Review
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour
Map - Intersection Capacity Analysis - Evening Peak Hour
Map - Exisitng Bicycle Routes - I-95 Corridor Study Area
Chapter Three - Future Transportation Conditions (Report)
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour 2025 No Build Condition
Map - Intersection Capacity Analysis - Evening Peak Hour 2025 No Build Condition
Chapter Four - Existing Environmental Conditions (Report)
Map - Surface Water Resources
Map - Ground Water Resources
Map - Farmland Soils
Map - Cultural and Sensitive Environmental Resources
Map - Landuse
Map - Environmental Justice Census Tracts/Block Groups
Chapter Five - Improvement Concepts Analysis (Report)
Map - Conceptual Typical Sections - 4-lane Section to 6-lane Section
Maps -Corridor Improvement Concepts- use links below
- Exits 54 - 62 Branford - Madison
- Exit 62 - 69 Clinton - Old Saybrook
- Exit 70 - 84 Old Lyme - New London
- Exit 85 - 93 Groton - Rhode Island State Line
Map - Mainline/Ramp/Weave Capacity Analysis - Evening Peak Hour 2025 Build Condition
Map - Intersection Capacity Analysis - Evening Peak Hour 2025 Build Condition
Chapter Six - Implementation Plan (Report)
Maps - Near Term Intersection Improvement Concepts
Maps - Near Term Interchange Improvement Concept
6-2-5 Exit 82 (continued) locale
Map - Near Term Median Improvements
Map - Long Term Implementation Plan
Chapter Seven - Products of Public Participation
Public Comments 1
Public Comments 2
Public Comments 3
Public Comments 4
Public Comments 5
Public Comments 6
Public Comments 7
Public Comments 8
Appendices
Transit Service Enhancements Analysis
Feasibility of Managed Lanes
Existing Infrastructure System Inventory
Future Transportation Conditions
Improvement Concepts Analysis
Commonly Used Abbreviations
Identification of Commonly Used Abbreviations
Technical Advisory Committee Meetings
Study Advisory Committee Meeting #1 - November 2002
Study Advisory Committee Meeting #2 - April 2003
Study Advisory Committee Meeting #3 - June 2003
Study Advisory Committee Meeting #4 - October 2003
Transit Report Meeting - September 18, 2003
Study Advisory Committee Meeting #5 - February 2004