This is a library of recurring special provisions for use on ConnDOT Projects.
REMINDER - These special provisions are not to be altered without the consent of the owner (author).
A listing of the Owned Special Provisions with the links is shown below.
Provision | English Units |
Owner - Email
|
---|---|---|
Liquidated Damages | 0.001_Liquidated Damages.doc | |
Liquidated Damages | 0.003_LD Planting.doc | |
Liquidated Damages | 0.005_LD 1hr Supp.doc | |
Liquidated Damages | 0.007_Combined Proj.doc | |
Liquidated Damages | 0.009_Combined & Supp.doc | |
Pre-Bid Site Visit - Metro North (rev. 12-17-2018) | 0.009 Pre-Bid Site Visit - Metro North | |
Notice to Contractor - Pre-Bid Questions And Answers | 0.010_NTC_-_Prebid_Q and_A_201609.docx | |
Notice to Contractor - Contract Duration | 0.011_NT C - CONTRACT DURATION.doc | Robert Foley |
Notice To Contractor - Construction Contractor Digital Submission (rev. 2-6-2018) | 0.012 NTC - Constr Contractor Digital Submission 2-6-2018.docx | |
Notice To Contractor - All-Inclusive Drainage (rev. 10-31-2017)
Guidance Document for Designers (rev.10-31-2017)
|
||
Notice To Contractor - CAS Requirement for ABC | 0.021_NTC_CAS_Requirement_1-20-16.docx | |
Notice to Contractor - Architectural and Industrial Maintenance Coatings (rev. 6-26-2018) | 0.022_NTC_AIM Coatings_6-26-18 | |
Notice to Contractor - Use of State Police Officers | 0.025_NTC - Use of State Police Officers 6-21-17.doc | |
Notice to Contractor - Procurement of Materials | 0.027_NTC - PROCUREMENT.doc | |
Notice to Contractor - Railroad Specifications | 0.035_NTC - RAILROAD SPECS.doc | |
Notice to Contractor - Utility Specifications
|
0.037_NTC - UTILITY SPECS.doc | |
Notice to Contractor - Rights of Way Restrictions | 0.040_NTC - ROW RESTRICTIONS.doc | |
Notice to Contractor - Environmental Investigation (rev. 10-19-2016)
|
0 .051_NTC - ENVIRONMENTAL INVESTIGATIONS.doc | |
Notice to Contractor - EED - Electronic Engineering Data
|
0.055_NTC_EED_ELECTRONIC_ENGINEERING_DATA.DOC | |
Notice to Contractor - 1.05 Control of the Work (rev. 1-9-2019) | 0.056_NTC-1.05.03-Quality_Management_Plan_1-9-19.docx | |
Notice to Contractor - Quality Control Program Level 1 (rev. 1-9-2019) | 0.057_NTC-Contractor_QC Program_Level_1_1-9-19.doc | |
Notice to Contractor - Quality Control Program Level 2 (rev. 1-9-2019) | 0.058_NTC-Contractor QC Program Level 2 1-9-19.doc | |
Notice to Contractor - Equipment Operation and Protection on Parkway | 0.065_NTC - EQUIPMENT OPERATION & PROTECTION.doc | |
Section 1.02.04 - Proposal Requirements and Conditions
|
0.075_sec1.02.04_examination_plans_etc.doc | |
Section 1.03.02 & 1.03.08 - Accelerated Award and Execution of Contract
|
0.080_sec1.03.02_08_accelerated_award_and_ntp.doc | |
Section 1.03.08 - No Winter Shutdown - Award and Execution of Contract
|
0.080_sec1.03.08_no_winter_shutdown.doc | |
Section 1.05.02 - Contractor Submittals (rev. 7-14-2017) | 0.090 Sec1.05.02 Contractor Submittals_20180206.docx | |
Section 1.06.07 - Certification - Control of Materials
|
0.100_SEC1. 06.07 CERTIFICATION.doc | |
!!!Missing!!! Section 1.07.07 - Legal Relations and Responsibilities - Safety and Public Convenience (rev. 6-4-15) | Anthony Kwentoh | |
!!!Missing!!! Section 1.07.10 - Legal Relations and Responsibilities - Soverign Immunity
|
0.115 SEC 1.07.10 SOVEREIGN IMMUNITY.doc | |
Section 1.07.11 - Legal Relations and Responsibilities - Guiderail Rpeair
|
0.116_SEC1.07.11 GUIDERAIL REPAIR.doc | |
Section 1.08 - Prosecution and Progress w/o Winter Shutdown
|
0.120_09_no_winter_shutdwn.doc | |
Section 2.86 - Drainage Trench Excavation, Rock In Drainage Trench Excavation (rev. 10-31-17)
Guidance Document for Designers (rev.10-31-2017)
|
||
Section 4.06 - Bituminous Concrete (rev. 10-5-2018) | 0.128_Sec4.06_Bituminous Concrete_10-5-2018.doc | |
Section 5.86 – Catch Basins, Manholes and Drop Inlets (rev. 10-31-17) Guidance Document for Designers (rev.10-31-2017) |
||
Section 6.03 Structural Steel (rev. 3-8-2018) | 0.131_SEC6.03_Structural_Steel_Rev_3-8-18.doc | |
Section 6.86 – Drainage Pipes, Drainage pipe
Ends (Rev. 10-31-2017)
Guidance Document for Designers (rev.10-31-2017)
|
||
Section M.04 - Bituminous Concrete Materials (rev. 2-21-2019) |
0.137_SecM.04_Bituminous Concrete Materials_2-21-2019.doc | |
Section M.06 Metals (rev. 3-8-2018) | 0.141_SECM.06_Metals_Rev_3-8-18.doc | |
ON-THE-JOB Training (OJT) | 0.198_ojt provision - 2011.doc | |
Disadvantage Business
Enterprises as Subcontractors and Material Suppliers or Manufacturers
|
0.199_dbe.docx | |
Small Contractor and Small Contractor Minority Business
|
0.200_SBE.doc | |
!!! Missing !!!Handling and Disposal of Contaminated Concrete (rev. 8-23-2017) | 0020761A_Hand_&_Disp_Contam_Conc_08-23-17.doc | |
Disposal of Sediments (rev. 8-23-2017) | 0020763A_Disposal_of_Sediments_08-23-17.doc | |
Water Transportation for Inspection Personnel (rev. 8-11-2017)
|
||
Water Rescue Operations (rev. 8-11-2017) | 0100427A-Water Rescue Operations 8-11-17.docx | |
Environmental Health and Safety
|
0101000A.doc | |
Hazardous Material Excavation (rev. 8-23-2017)
|
0101109A_Hazmat_Excavation_08-23-17.doc | |
Controlled Materials Handling (rev. 8-23-2017) | 0101117A_Controlled_Materials_Handling_08-23-17.doc | |
Disposal of Hazardous Waste (rev. 8-23-2017)
|
0101126A_Disposal_of_Hazardous_Waste_08-23-17.doc | |
Securing, Construction and Dismantling of a Waste Stockpile and Treatment Area | 0101128A.doc | |
Environmental Work - Solidification
|
0101130A.doc | |
Disposal of Contaminated Railroad Ties (rev. 8-23-2017) | 0101133A_Disposal_of_Contam_RR_Ties_08-23-17.doc | |
Disposal of Contaminated Timber Piles (rev. 8-23-2017) | 0101140A_Disposal_of_Contam_Timber_Piles_08-23-17.doc | |
PCB Waste Handling (rev. 8-23-2017) | 0101175A_PCB_Waste_Handling_08-23-17.doc | |
Disposal of PCB Waste (rev. 8-23-2017) | 0101176A_Disposal_of_PCB_Waste_08-23-17.doc | |
CTDOT Boundary Marker | 0107090A.doc | |
Excavation and Reuse of Existing Channel Bottom Material (rev. 6-1-2017) | 0202216A-Excavation_Reuse_Existing_Channel_Bottom_Material_6-1-17.docx | |
Supplemental Streambed Channel Material (rev. 6-1-2017) | 0202217A-Supplemental_Streambed_Channel_Material__6-7-17.docx | |
J-Hook Vane (rev. 2-16-18) | 0202223A-J-Hook Vane 2-16-18.docx | |
Disposal of Controlled Materials (rev. 8-23-2017)
|
0202315A Disposal_of_Controlled_Materials_08-23-17.doc | |
Management of Reusable Controlled Material
|
0202318A.doc | |
2" Groundwater Monitoring Well Abandonment (rev.
10-19-2016)
|
0202640A2in_GW_Monitoring_Well_Abandon_10-19-16.doc | |
4" Groundwater Monitoring Well Abandonment (rev. 10-19-2016)
|
0202641A4 in_GW_Monitoring_Well_Abandon_10-19-16.doc | |
Handling Contaminated Groundwater (rev 6-6-2011) | 0204213A_Handling_Cont_GW_06-06-11.doc | |
Instructions for using Item #0216012 Controlled Low Strength Material
|
0216012A instructions for use.doc | |
Controlled Low Strength Material | 0216012A.doc | |
!!! Missing !!! Instructions for Use of Milling Bituminous Concrete Specifications | 0406272A_Instructions_For_Use_2015.doc | |
!!! Missing !!!Milling of Bituminous Concrete – (0 - 4 inches)
Milling of Bituminous Concrete – (over 4 to 8
inches)
Milling of Bituminous Concrete – (greater than 8
inches)
|
0406272A.doc | |
!!! Missing !!!Fine Milling of Bituminous Concrete (0 to 4 inches) | 0406275A.doc | |
!!! Missing !!!Micro-Milling of Bituminous Concrete (0 to 2 inches) | 0406276A.doc | |
!!! Missing !!!Removal of Existing Wearing Surface | 0406277A.doc | |
Rumble Strips | 0406287A.doc | |
Removal of Rumble Strips | 0406289A.doc | |
Asphalt Adjustment Cost (rev. 7-18-2016) | 0406999A_-_asphalt_adjustment_cost_20160718.doc | |
Strip Seal Expansion Joint System | 0520034A.doc | |
!!! Missing !!! Asphaltic Plug Expansion Joint System | 0520036A.docx | |
Strip Seal Expansion Joint System for Rehabilitation Prroject | 0520040A.doc | |
(Size) Precast Concrete Box Culvert (rev. 3-6-18) | ||
!!! Check Link !!! Full Depth Patch (High Early Strength Concrete) (rev. 11-26-2018) | Full Depth Patch (High Early Strength Concrete) | |
Partial Depth Patch (rev. 2-4-2019) | 0601318A_Partial_Depth_Patch 20190204.docx | |
Instructions for using Item #601445A Embankment Wall | 0601445A instructions for use.doc | |
Embankment Wall (Site No. 1) | 0601445A.doc | |
Retaining Wall (Site No. ) | 0601651a.doc | |
Clean and Coat Exposed Reinforcing Steel (rev. 12-3-2015) | 0602980A_Clean_and_Coat_Exposed_Reinforcing_Steel_20151203.docx | |
Instructions for Using Structural Steel Items | 0603061A instructions for use.doc | |
Structural Steel (rev. 6-26-2018) | 0603061A_StrucStl(SiteNo.1)_6-26-18.doc | |
Instructions for using paint removal specifications (rev. 6-26-2018) | 0603479__thru_0603xxx_Paint_Removal_Specs_Guidance_6-26-18.docx | |
!!! Missing !!!Abrasive Blast Cleaning and Field Painting of Beam Ends (Site No. X) (rev. 6-26-2018) | 0603479A_ABC&FieldPntgBeamEnds_6-26-18.doc | |
!!! Missing !!!Class 1 Containment and Collection of Surface Preparation Debris (Site No. X) (rev. 11-6-2018) | 0603563A_Class1Cont&CollSurfPrepDebris_11-6-18.doc | |
<!!! Missing !!! Localized Paint Removal and Field Painting of Beam Ends (Site No. X) (rev. 8-13-2018) | 0603681A_Locpntremvl&fieldpntgbeamends_8-13-18.doc | |
!!! Missing !!! Localized Paint Removal and Field Painting Of Existing Steel (rev. 8-13-2018) | 0603729A_Locpntremvl&fieldpntgexiststl_8-13-18.doc | |
!!! Missing !!! Abrasive Blast Cleaning and Field Painting of Structure (Site No. X ) (rev. 6-26-2018) | 0603923A_ABC&Field_PntgStruc_6-26-18.doc | |
Rounded Riprap (rev. 10-24-2017) | 0703014A Rounded Riprap 10-24-2017.doc | |
Placement of Channel Boulder (rev. 2-6-18) | 0703030A-Placement of Channel Boulder 2-6-18.docx | |
Rock Weir (rev. 2-7-18) | 0703031A-RockWeir 2-7-18.docx | |
Saw-Tooth Deflector (rev. 4-2-2018) | 036A Saw-Tooth Deflector 4-2-18.doc | |
Cross Vane (rev. 4-20-2018) | 037A Cross Vane 4-20-18.doc | |
Rock Vane (rev. 4-20-2018) | 038A Rock Vane 4-20-18.doc | |
Placement of Toe Boulders (rev. 4-20-2018) | 040A Placement of Toe Boulders 4-20-18.doc | |
Membrane Waterproofing (Cold Liquid Elastomeric) (rev. 10-6-2016) | 0707009A_Membrane_Waterproofing_(Cold_Liquid_Elastomer)_20161006.doc | |
Penetrating Sealer protective Compound (rev. 10-2-2018) | 0819002A Penetrating Sealer Protective Compound | |
(Relocated) Temp. Glare Screen Modules Units | 0822042A.doc | |
0900000A Noise Mitigation | 0900000A.doc | |
Merritt Parkway Guiderail | ||
Merritt Parkway Guiderail | ||
Guide Rail Repair | 0917010A.doc | |
Wildflower Establishment (rev. 6/12/17) | 0945005A-Wildflower 6-12-17.docx | |
Conservation Seeding for Slopes (rev. 10-20-2017) | 0950040A Conservation Seed for Slopes 10-20-17.doc | |
Wetland Grass Establishment (rev. 10-03-17) | 0950043A_Wetland_Grass_Establishment_10-03-17.docx | |
Shoreline Grass Establishment (rev. 12-11-17) | 0950202A-Shoreline Grass Establishment 12-11-17.docx | |
Control and Removal of Invasive Vegetation (rev. 6/16/2017) | 0952051A_Cntrl_Remvl_of_Inv_Veg_rev_6-16-2017.doc | |
!!! Missing !!! Project Coordinator (Minimum Bid) | ||
Contractor Quality Control Program Guidance Document (rev. 4/1/2019) |
0969053A-054A-Contractor_QC_Guidance_Document_4-1-19.docx | |
Contractor Quality Control Program level 2 (rev. 4/1/2019) |
Contractor Quality Control Program level 2 | |
Contractor Quality Control Program Level 1 (rev. 4/1/2019) |
Contractor Quality Control Program Level 1 | |
Instructions for Construction Field Office, Small, Medium, Large & Extra-Large and Construction Field Office Furnishing and Equipment (rev. 9-14-2016) | Christopher Angelotti | |
Construction Field Office, Small, Medium, Large & Extra-Large (rev. 9-14-2016) | 0969060A_-_066A_Construction_Field_Office_Type_20160914.docx | |
Construction Field Office Furnishing and Equipment (rev. 9-14-2016) | ||
!!! Missing ! !!Opposing Traffic Lane Divider (rev. 11-17-15) | 0981101A_Rev_11-17-15.doc | |
Disposal of Buildings | 0999001A.doc | |
Remove Light Standard | 1003906A.doc | Mark Bear |
Remove Concrete Light Standard Base | 1003912A.doc | Mark Bear |
Remove and Relocate Light Standard | 1003916A.doc | Mark Bear |
Remove Wood Pole | 1003917A.doc | Mark Bear |
Remove Existing Luminaire | 1003925A.doc | Mark Bear |
Remove Underbridge Luminaire | 1006151A.doc | Mark Bear |
Clean Existing Concrete Handhole | 1010060A.doc | Mark Bear |
Steel Junction Box Cover | 1009300A.doc | Mark Bear |
Remove Concrete Handhole | 1010902A.doc | Mark Bear |
Remove Cable | 1014901A.doc | Mark Bear |
Pre-Assembled Aerial Cable | 1019027A.doc | Mark Bear |
Aerial Cable (3 No. 2) | 1019053A.doc | Mark Bear |
Wood Pole | 1020001A.doc | Mark Bear |
Temporary Illumination Unit | 1020030A.doc | Mark Bear |
Install State Furnished Sign Face Sheet Aluminum | 1204120A.doc | Philip Cohen |
6" Preformed Plastic Pvmt Mrkgs | 1209512a.doc | |
Service Connections | 1700001A.doc | Derek Brown |
Elastomeric Concrete Header (rev. 5-6-2019) | 0520032A - Elastomeric Concrete Header 5-6-19.docx | Jon Hagert |
Preformed Joint Seal (rev. 5-6-2019) | 0520041A - Preformed Joint Seal 5-6-19.doc | |
Embedded Galvanic Anodes (rev. 5-6-2019) | 0603726A - Embedded Galvanic Anodes 5-6-19.doc | Jon Hagert |
Handling Water & Handling Water (Site No. X) (rev 2-11-2019) |
0204151A-Handling Water thru 020440XA- Handling Water (Site No. X) 2-11-2019.doc | Andrew Piraneo |
Handling Water Guidance Doc for Designers (rev 4-25-2019) | 0204151A-020440XA Handling Water Guidance Doc for Designers 4-25-19.doc | Andrew Piraneo |
Notice To Contractor - Portland Cement Concrete Mix Classifications (rev. 5-9-2019) | 0.019_NTC-PCC Mix Classifications 5-9-19.docx | |
Section 6.01 - Concrete For Structures (rev. 5-8-2019) | 0.131_SEC6.01-Concrete for Structures 5-8-19.doc | Jon Hagert |
Section M.03 - Portland Cement Concrete (rev. 5-8-2019) | 0.136_SECM.03-Portland Cement Concrete 5-8-19.doc | Jon Hagert |
Notice To Contractor - Portland Cement Concrete Mix Classifications (rev. 5-20-2019) | class="no-direct-text-content"0.019_NTC-PCC Mix Classifications 5-20-19.docx | Jon Hagert |
Section 1.02.01 - Proposal Requirements and Conditions - Contract Bidding and Award (rev. 3-7-2019) | 0.072_SEC1.02.01 Contract Bidding and Award 3-7-19.docx | Robert Foley |
Contractor Prequalification Work Classifications and Guidance Document(rev. 5-29-2019) | 0.072_SEC1.02.01 Contractor Prequal Class and Guide 5-29-19.pdf |
Gregory Straka |
Additional Provisions | 9999999 Additional Provisions Header Page.doc | R. Foley |
0.009_Pre-Bid Site Visit-Metro North 4-5-2019.docx |
Please e-mail your comments to the Department's Webmaster